You are a manufacturing consultant helping a client test out different bill of material (BOM) and route consumption options when starting production orders. Material and labor consumption are to be completed before Report as finish.
You are running a production order with BOM lines that have a Flushing principle set to Start. The Automatic Route Consumption Runtime has been set to Yes.
You have set up the default Start user options for all production orders as shown in the exhibit below.

Answer:
Explanation:
NEW QUESTION # 34
You need to implement the scheduled Kanban requirements.
Which rules should you use? To answer, drag the appropriate rules to the correct requirements. Each rule may be used once, more than once, or not at all. You may need to drag the spirt bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
Explanation
A close-up of a document Description automatically generated
NEW QUESTION # 35
You need to configure the requirements for metal fabrication equipment maintenance. What must you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
Explanation
A close-up of a computer screen Description automatically generated
NEW QUESTION # 36
You need to configure production operations for the pine and orange scent solutions.
Which three actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
- A. Configure the inventory policy for the item model group to set the value of the Stocked product option to Yes.
- B. Allocate subcontracted work in its own cost breakdown block.
- C. Use a purchase agreement as a service agreement.
- D. Configure a costing resource and requirement to point to a Vendor type resource.
- E. Configure the BOM line to be of type Vendor and associate the corresponding vendor account.
Answer: B,D,E
NEW QUESTION # 37
An automobile manufacturer leases cars to companies for use as company cars.
A car leased to a company breaks down and requires repairs.
You must open a maintenance request and replace the car with an equivalent model until the original car is repaired and returned to the company. When the manufacture' receives and inspects the car, the replacement car can be released to the company.
You need to select the maintenance request components to use.
Which components should you use? To answer, drag the appropriate components to the correct assets. Each component may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
Note: Each correct selection is worth one point.
Answer:
Explanation:
Explanation
To select the maintenance request components to use, you should use the following:
The leased car that must be repaired: You should use the component. An inbound asset is an asset that is received from a customer or vendor for maintenance or repair1. You can use the Inbound assets page to create and manage inbound assets in Asset Management2. You can also create a maintenance request for an inbound asset and link it to a work order3.
The replacement car for the leased car: You should use the Outbound asset component. An outbound asset is an asset that is sent to a customer or vendor as a temporary replacement for an asset that is being maintained or repaired1. You can use the Outbound assets page to create and manage outbound assets in Asset Management. You can also link an outbound asset to an inbound asset or a work order.
1: Inbound and outbound assets 2: Inbound assets 3: Create a maintenance request for an inbound asset :
[Outbound assets]
NEW QUESTION # 38
A bicycle manufacturing company is implementing Dynamics 365 Supply Chain Management.
The warehouse must pick and stage parts other than paint for bicycle assembly. Paint is at the production station.
You need to configure the reservations for production.
What should you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
NEW QUESTION # 39
You need to meet the requirements for User2.
What should you configure?
- A. Create a transfer journal.
- B. Create a movement journal.
- C. Correct the product receipt.
- D. Process over/under transactions.
- E. Cancel the product receipt.
Answer: D
NEW QUESTION # 40
You are a production manager at a company which produces large batches of coffee and creamers.
After a quality inspection, batch 120008 of your cold brew coffee (item number CB-0001) was found to be too acidic and must be reworked.
You need to add 20 grams of sugar and stir the product for an additional 0.S hours.
What three actions are required on the rework order? Each correct answer presents pan of the solution.
NOTE: Each correct selection is worth one point.
- A. Add 20 grams of sugar to the production formula.
- B. Manually reserve batch 120008 after estimating the batch order.
- C. Delete all items from the production formula except for 20 grams of sugar.
- D. Delete all route operations except for a half an hour stirring operation.
- E. Add a route operation for 0.5 run time hours of stirring.
Answer: A,D,E
Explanation:
The correct answer is B, C, and E. Here is the explanation:
To rework a batch order in Dynamics 365 Supply Chain Management, you need to create a new batch order and set the Rework batch toggle to Yes1. You also need to select the Batch number of the original batch that needs to be reworked1. The new batch order will have only one formula line that represents the original batch, and no route operations1.
To add 20 grams of sugar and stir the product for an additional 0.5 hours, you need to do the following actions on the rework order:
Add 20 grams of sugar to the production formula. You can do this by clicking on the Formula option on the All production orders form and adding a new formula line for sugar with a quantity of 20 grams1. You can also specify the ingredient type for sugar, such as Compensating or Filler2.
Add a route operation for 0.5 run time hours of stirring. You can do this by clicking on the Route option on the All production orders form and adding a new route operation for stirring with a run time of 0.5 hours1. You can also specify the resource or resource group that will perform the stirring operation3.
Delete all route operations except for a half an hour stirring operation. You can do this by clicking on the Route option on the All production orders form and deleting any existing route operations that are not related to stirring1. This way, you can avoid unnecessary steps and costs for the rework order.
NEW QUESTION # 41
A manufacturer uses Dynamics 365 Supply Chain Management to create bicycle parts as a configure-to-order configuration. All bicycle parts are sourced from external sources and assembled in the manufacturing facility.
The manufacturer plans to expand its capabilities to create custom bicycles parts in an engineer-to-order model. All bicycle parts will be created in the manufacturing facility. The custom bicycle parts must be omitted from any master planning process.
You need to describe the concepts for the requirements.
Which concepts should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
NEW QUESTION # 42
A discrete manufacturer uses the time and attendance registration for production operations.
All employees register daily clock in and clock out times during a 40-hour. Monday through Friday workweek.
Pay periods are every two weeks. Workers are paid hourly.
The production manager will create work schedules with the following windows:
* Mandatory work hours
* Work hours during which employees can leave early without accruing absences
* Work hours during which employees can work extra time
If a junior production worker works over 90 hours in a pay period. the worker will receive lime and a half over
80 hours. If a senior production worker works over 90 hours in a pay period, the worker will receive double time over 80 hours.
Vou need to configure the system for these requirements.
Where should you configure this functionality? To answer, drag the appropriate forms to the correct requirements. Each form may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
Explanation
To configure the system for these requirements, you should use the following forms:
Configure the overtime calculations: You should use the form. This form allows you to set up and maintain information about workers, such as their personal details, employment status, and compensation1. You can also specify the overtime rate for each worker on the Time and attendance tab2. For example, you can set the overtime rate to 1.5 for junior production workers and 2 for senior production workers.
Configure the periods of time that a worker can choose whether to work: You should use the Flex groups form. This form allows you to set up and maintain flex groups, which are groups of workers who have flexible work hours3. You can also define flex profiles for each flex group, which specify the mandatory work hours, the flex time hours, and the extra time hours for each day of the week3. For example, you can create a flex profile that has mandatory work hours from 8:00 AM to 4:00 PM, flex time hours from 4:00 PM to 6:00 PM, and extra time hours from 6:00 PM to 8:00 PM.
1: Workers 2: Set up overtime rates 3: Flex groups : [Flex profiles]
NEW QUESTION # 43
You are using the manufacturing execution module in Dynamics 365 Supply Chain Management. License plate labels must be printed for products in the Report as finished step. You need to use the manufacturing execution functionality that meets this requirement. What should you use?
- A. Production waves
- B. Operations schedules
- C. License plates
- D. Job card device
Answer: C
Explanation:
Explanation
The manufacturing execution functionality that meets the requirement of printing license plate labels for products in the Report as finished step is License plates are unique identifiers that are assigned to containers, pallets, or individual items in inventory. License plates can be used to track and manage inventory throughout the warehouse processes, such as receiving, put away, picking, packing, and shipping1. License plates can also be used in production processes, such as reporting as finished and raw material picking2.
To print license plate labels for products in the Report as finished step, you must enable the Generate license plate option on the mobile device menu item that is used for reporting as finished2. You must also set up a document routing layout and a document routing for license plate labels3. When you use the mobile device to report a production order as finished, the system will generate a license plate for the finished product and print a license plate label to the specified printer2. The license plate label can include information such as the item number, batch number, quantity, and barcode of the finished product3.
1: License plates 2: Enable license plate label printing 3: Document routing label layouts
NEW QUESTION # 44
You need to configure production control parameters for liquid cleaning solution manufacturing.
What are two possible ways to achieve this goal? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
- A. Require an electronic signature when the formula is approved.
- B. Select Block editing and approve the formula.
- C. Select the Block removal of approval option for the formula
- D. Select the Block editing option only.
Answer: B,C
Explanation:
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/production-control/formulas-versions
Topic 2, CASE STUDY 1 Manufacturing Company
General information
A manufacturing company produces custom configured-to-order motorcycles. The company plans to implement Dynamics 365 Supply Chain Management. The company contains one legal entity located in Missouri where all production and warehousing operations occur.
Customization options
The custom motorcycles have a variety of selections that can be selected in the listed order by the end customer, including the following:
Customization restrictions
The following restrictions on customizations are in place:
* Green color can only be sold with the Legend Trim.
* Orange color can be sold with the Sport or Legend Trim.
* The ML seat must be included in the Legend package.
* The MS seat must be included in the Sport package.
Manufacturing facilities
The company includes the following manufacturing groups: Assembly and Plastic Molding. The Assembly group is responsible for assembling the motorcycles with purchased and manufactured goods. The Plastic Molding group is responsible for manufacture of all plastic parts used in the assembly area.
Motorcycle manufacturing
The parts for the product assembly are picked from the warehouse and staged at the correct workstation by a warehouse operator for each production order.
Plastic manufacturing
Plastic parts are molded using dyes that create multiple parts at once. The parts are machined in the same production process to remove excess plastic and add additional holes for assembly. Excess plastic is recycled back into the feedstock of the same color plastic chips for use in the molding process.
Metal Parts
Raw metal parts are purchased fully machined but without primer or paint. The parts are subcontracted to a vendor for primer and paint based upon the color requirements.
Facility
The company has a single warehouse that supports both the assembly and plastic manufacturing areas. The warehouse consists of three aisles with 15 bins and three shelves. The facility has no Wi-Fi capacity but has hardwired terminal stations throughout the assembly production line.
Transactions are currently completed by office staff. Raw materials transfer must support capacity constraints for paint and primer.
Requirements
The company has a single warehouse that supports both the assembly and plastic manufacturing areas. The warehouse consists of three aisles with 15 bins and three shelves. The facility has no Wi-Fi capacity but has hardwired terminal stations throughout the assembly production line.
Transactions are currently completed by office staff. Raw materials transfer must support capacity constraints for paint and primer.
Sales Order
The company has the following requirements for sales orders:
* During the configuration of a sales order, invalid combinations must be prevented.
* Each configuration must create a unique bill of material (BOM) and Route based on options selected.
* Sales pricing for the sales order must be based upon options selected.
* Due to emissions regulations, the motorcycles cannot be sold to the state of California.
Motorcycle manufacturing
The company has the following requirements for motorcycle manufacturing:
* Schedule labor only at the labor pool level without machines by day
* Produce motorcycles within a scheduled day in any order.
* Record actual production labor with start/stop times.
* Record manager approval of labor entered prior to posting.
* Post actual material consumption after production is finished.
Plastic manufacture
The company has the following requirements for motorcycle manufacturing:
* Schedule both labor and machines.
* Adjust schedules by using a Gantt chart.
* Backflush standard labor by operation.
* Post actual material consumption at the start of production.
* Track and allocate costs to the excess plastic.
* Report multiple molded part numbers during the same production run.
* Determine the correct mold to use on a production order.
* Generate a batch number for each production order.
Metal Parts
The company has the following requirements for metal parts manufacturing:
* Schedule shipments to the vendor for painting.
* Receive painted parts into inventory from the vendor.
* Track vendor inventory levels.
Default
You must configure defaults for manufacturing execution production orders to meet the following requirements:
* Ensure accuracy for production order pick list posting.
* Ensure correct pick list creation.
Issues
A). In the current system, the company cannot calculate overhead rates and determine the breakdown of material, labor, machine, and overhead costs for production.
B). The company is manually calculating an 8% overhead on materials and posting a journal manually.
NEW QUESTION # 45
You need to configure system attributes.
Which attribute types should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
Explanation
Graphical user interface, text, application, table, email Description automatically generated
NEW QUESTION # 46
You need to resolve the production manager issue.
How should you configure manufacturing execution? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
Explanation
Reference:
https://docs.microsoft.com/en-us/dynamicsax-2012/appuser-itpro/about-production-parameters-in-manufacturing
Topic 1, Fabrikam inc sanitation cleaning solutions
Background
Fabrikam Inc. is a manufacturer of sanitation cleaning solutions and equipment including carpet/floor cleaners, pressure washers, scrubbers and vacuums.
Fabrikam Inc. is a single legal entity based in New York city.
_ Current environment
Products manufactured
* Cleaning equipment
o floor cleaner
o pressure washers
o scrubbers
o vacuums
* Liquid cleaning solutions
o No scent
o Orange scent (subcontracted to a vendor named VendorA)
o Pine scent (subcontracted to a vendor named VendorA)
The production quantity for the finished unscented liquid cleaning solution is 40-liters. IngredientC 'or unscented liquid cleaning solution Is stored in inventory in 50-liter barrels and allocated in 50-liter increments.
Two barrels of IngredientC are uses to produce a barrel of unscented liquid cleaning solution.
Production sites
* The Eastern United States facility manufactures equipment.
* The Western United States facility manufactures liquid cleaning solutions.
* Raw materials and finished products are stocked at the warehouse and distributed from the warehouse.
Warehouse facilities
The warehouse consists of the following zones:
_ Requirements
Cleaning equipment manufacturing
You identify the following require merits for manufacturing cleaning equipment:
* Production is Make to Stock and must be scheduled at an operational level.
* Machine equipment is produced on an assembly line. Scheduling must be based on production orders.
* Finished products must be packaged and shipped directly from the warehouse.
* To reduce delivery times and excess inventory, equipment must be produced as needed.
* The ability to schedule production must be based on resource capacity and the availability of required materials.
* Production order operations must be scheduled to start only when capacity and materials are available at the same time and in the required quantities.
Liquid cleaning solution manufacturing
* Production is Make lo Order and is scheduled at the job level. Products must be manufactured in batches.
* Finished products must be packaged and shipped directly from the warehouse.
* You must be able to calculate the estimated consumption of ingredients and ensure that the amount is divisible by the number of units the raw material as available.
* Formula changes must be reviewed and approved. You must ensure that approved formulas cannot be deleted or edited. Approved formulas may be deactivated.
* An ingredient used to manufacture unscented cleaning solution is defined as a restricted product. You must be able to automatically print a product safety data sheet (PSDS) with the packing slip for any order that includes unscented cleaning solution.
* Production must be scheduled to start by date and time according to the order that is specified by the production route.
* You must implement a scheduled Kanban rule that meets the following requirements:
o Prevent overloading a work cell for scheduled Kanbans.
o Visualize excess inventory in a supermarket.
o Store products in supermarkets before they are consumed or shipped.
* You must link relevant financial dimension data to the inventory transactions at each site to ensure that you can trace profit and loss figures directly to East site and West site respectively.
* You must set up production operations for sub-contracting of Pine scent and Orange scent solution to VendorA to ensure that a purchase order is automatically created based on estimation of a production order.
Costing
* The price of raw materials used for manufacturing unscented cleaning solution must be tracked based upon commodity exchange pricing. The margin and cost multiplier must be set up for commodity traded raw material.
* You must set up cost calculation groups to ensure that indirect costs that originate in the manufacturing of finished goods are recognized and absorbed into the product cost.
* The production manager needs to set up picking list journals and BOM item consumption.
Reporting
* Production control parameters must be setup for reporting of automatic BOM and Route consumption.
* You must create reports that include information about cost records and categories for items, and calculation formulas for indirect costs.
* You must treat manufactured items as purchased items for cost roll-up purposes during BOM calculations and reporting.
* You must configure automatic route consumption in connection with the automatic running of Report as finished.
Inventory control
You must not be required to track the tot number for items when you enter inventory information into the system. Lot numbers for items must be entered when items are picked from inventory.
Issues
Users report the following issues:
* The production manager observes that items are being deducted from inventory two times on production jobs. A shop supervisor mistakenly registers the process for assembling batteries for the pressure washers to Registered as prepared. You must reschedule the process for a future date.
* Customer1 orders 20 barrels of unscented solution. The order is confirmed. Production must be scheduled to start on December 21 to meet the customer's delivery deadline.
* User2 reports that costs for manufactured items are twice as high as expected.
* UserD reports that the formula for the liquid cleaning solution sometimes changes during production. You must enforce the policies regarding formula editing for current and future use.
NEW QUESTION # 47
You use the master planning module for Dynamics 365 Supply Chain Management.
Planned production orders have been created.
Several sales orders are canceled in response to concerns about recent online reviews of a product.
You need to enable the appropriate action message.
Which action message should you enable?
- A. Derived actions.
- B. Decrease
- C. Advance
- D. Postpone
- E. Increase
Answer: B
Explanation:
Explanation
The action message that you should enable is Decrease. Here is the explanation:
An action message is a system-generated suggestion to change an existing planned, approved, or firmed order. Action messages are generated by the master planning calculation in response to changed requirements1. For example, the ship date or quantity is changed on a sales order after you've already created a purchase order to fulfill the demand for that sales order. In this case, the master planning calculation generates one or more action messages that suggest that you update the purchase order. You decide whether to make the changes that are suggested.
The Decrease action message indicates that production orders, purchase orders, and other receipt transactions should be decreased to prevent excess inventory levels1. This action message is generated when there is less demand for a product than was previously planned. For example, if several sales orders are canceled, the master planning calculation will generate a Decrease action message for the corresponding planned production orders.
To enable the Decrease action message, you must select it on the Coverage groups page for the coverage group or item that you want the message to apply to1. You can also specify a decrease margin, which is the minimum percentage difference between the current quantity and the suggested quantity that will trigger a Decrease action message1.
NEW QUESTION # 48
You need to set up the system to calculate the overhead rates automatically for production.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Explanation:
1 - Create cost groups.
2 - Associate cost groups to items and resources.
3 - Create overhead calculation node for materials as sucharge and labor as rate for setup time.
4 - Define the basis for calculation costs as absorption.
NEW QUESTION # 49
You need to plan scheduling for Customer1's order of unscented solution.
What are two possible ways to achieve the goal? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
- A. Schedule productions based on the capacity of the resources.
- B. Plan scheduling of the production at the resource group level.
- C. Run master planning with a specific time fence.
- D. Split and plan operations in detail for each of the resources.
- E. Schedule production based on the availability of raw material.
Answer: A,E
NEW QUESTION # 50
You work for a gem wholesaler that sells raw diamonds. Diamonds are purchased and sold in individual boxes but weighed and inventoried in carats.
You are setting up a catch weight item for diamonds. Each box of diamonds must be tracked by its individual container weight.
You need to set up this item as a full visibility catch weight item.
Which two steps must you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
- A. Assign a Tracking dimension group with batch number as the only active tracking dimension.
- B. Assign the item a Tracking dimension group with active serial number control
- C. Create an inter-class unit of measure conversion between boxes and carats.
- D. Assign it a Serial number group with per qty. defined as 1.
Answer: B,C
Explanation:
A catch weight item is an item that is sold by one unit of measure but is managed in inventory by a different unit of measure1. For example, diamonds are sold by boxes but weighed by carats. A full visibility catch weight item is a catch weight item that requires the weight of each individual container to be tracked2. For example, each box of diamonds must have its own weight recorded.
To set up a catch weight item for diamonds, you must do the following steps2:
Assign the item a Tracking dimension group with active serial number control. This enables the item to be tracked by serial numbers, which represent the individual containers of the item.
Each serial number will have its own weight associated with it.
Assign the item a Serial number group with per qty. defined as 1. This ensures that each container of the item has a unique serial number and that only one container can be assigned to a serial number.
Create an inter-class unit of measure conversion between boxes and carats. This defines the relationship between the sales unit and the inventory unit of the item. The conversion factor can be based on a nominal weight or an average weight of the containers.
NEW QUESTION # 51
......
Exam Questions for MB-335 Updated Versions With Test Engine: https://www.certkingdompdf.com/MB-335-latest-certkingdom-dumps.html
Test Engine to Practice Test for MB-335 Valid and Updated Dumps: https://drive.google.com/open?id=1hqsd2n-_bTFAHIgtzP3HlNeSIW6CpVp9