
SAP Certified Application Associate C-TS422-2021 Practice Test Engine: Try These 82 Exam Questions
Guaranteed Success in SAP Certified Application Associate C-TS422-2021 Exam Dumps
C-TS422-2021 Exam Certification Details:
| Exam: | 80 questions |
| Sample Questions: | SAP C-TS422-2021 Exam Sample Question |
| Duration: | 180 mins |
| Level: | Associate |
SAP C-TS422-2021 Certification Exam Topics:
| Topic Areas | Topic Details, Courses, Books |
|---|---|
| Capacity Planning in SAP S/4HANA 8% - 12% | Outline best practices for using SAP S/4HANA, describe the SAP HANA database concept and new user experience with SAP Fiori, outline the capabilities of embedded analytics. |
| Material Requirements Planning in SAP S/4HANA 8% - 12% | Select and apply planning strategies, use the planning table, characterize long-term planning and master production scheduling, outline MRP basics and steps of MRP, and describe lot size procedures. |
| Master Data in SAP S/4HANA > 12% | Identify and explain production relevant master data, including, but not limited to: bill of material, routing and production version. |
| Lean Manufacturing in SAP S/4HANA 8% - 12% | Identify repetitive manufacturing specific master data, explain line load planning and confirmation, outline Kanban master data and Kanban processes. |
| Introduction to SAP S/4HANA Production Planning < 8% | Outline production planning components and functions, differentiate consumption-based planning vs. MRP, outline new trends in production planning. |
NEW QUESTION 29
Which SAP solutions support the supplier area in the portfolio of the Digital Value Network?
- A. SAP Concur
- B. SAP Fieldglass
- C. SAP SuccessFactors
- D. SAP Ariba
- E. SAP Hybris
Answer: A,B,D
NEW QUESTION 30
Which time elements are part of a routing operation?
- A. Pick/pack time
- B. Queue time
- C. Float before production
- D. Wait time
- E. Move time
Answer: A,B,D
NEW QUESTION 31
Your production planners must execute planning only for specific resources. How can you achive this in advanced Planning(PP/DS)
- A. Use heuristic.
- B. Use a planning group.
- C. Use a resource group.
- D. Use a propagation range.
Answer: A
NEW QUESTION 32
How can you carry out cost object controlling for production orders?
- A. Milestone-related
- B. Order-related
- C. Cost-related
- D. Product-related
Answer: B,D
NEW QUESTION 33
How can you set up the supply source for the Kanban process in SAP S/4HANA?
- A. Using purchase orders for external procurement
- B. Using stock transfer reservations for stock transfer
- C. Using quotations for internal and external procurement
- D. Using purchasing costs for automated source prioritization
- E. Using run schedule quantities for in-house production
Answer: A,B,E
NEW QUESTION 34
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?
- A. When multiple production versions are maintained for one product
- B. When multiple planned orders exist on one resource
- C. When multiple operations are maintained for one product
- D. When alternate resources are used within one operation
Answer: D
NEW QUESTION 35
What are the consequences when you assgn a planned order to a production line manually, using the planning table in repetitive manufacturing?
- A. The planed order generates capacity requirements
- B. The planed order's component availability is checked.
- C. The planned order's components are copied to the picking list.
- D. The planed order is converted to production order.
Answer: A
NEW QUESTION 36
You use planning strategy Finite Scheduling - with Reverse adn want to allow scheduling in the past. How can you achive this?
- A. Specify a negative offset time in the strategy profile.
- B. Specify a negative lanning horizon in the strategy profile.
- C. Specify a positive planning horizon in the strategy profile.
- D. Specify a positive offset time in the strategy profile.
Answer: A
NEW QUESTION 37
When working with bouth cross-plant and plant-specific material statuses n the material master, which statuses has the higest priority?
- A. The last restrictive status
- B. The plant-specific status
- C. The most restrictive status
- D. The cross-plant status
Answer: C
NEW QUESTION 38
For what production type are production orders used?
- A. Process manufacturing processes
- B. Discrete manufacturing processes
- C. Period and quantity-oriented production
- D. Replenishment controlled by control cycles
Answer: B
NEW QUESTION 39
During production order creation, several valid production versions are found. How does the system choose the production version?
- A. Alphanumeric or quota arrangement
- B. Valid period or sale order
- C. Planned order or material number
- D. Lot size or material cost
Answer: A
NEW QUESTION 40
When can the automatic material availability check occur in a production order?
- A. At order release
- B. At order confirmation
- C. At order settlement
- D. At order creation
Answer: A,D
NEW QUESTION 41
Which item statuses can you select inside a material BOM?
- A. Service
- B. Sales
- C. Engineering
- D. Quality management
Answer: B,C
NEW QUESTION 42
What are the possible results of a production planning run in Advanced Planning (PP/DS)?
- A. Production order
- B. Scheduling agreement schedule line
- C. Purchase requistion
- D. Planned order
- E. Stock transport order
Answer: B,C,D
NEW QUESTION 43
You want to use capacity availability checks for production orders. Which settings have to be made for this?
- A. An overall profile must be assigned in the checking control.
- B. The PRT Availability Check must be set in the checking control.
- C. The Relevant for Finite Scheduling indicator must be set
- D. A checking rule must be assigned in the checking control
Answer: A,C
NEW QUESTION 44
What happens to this dependent requirement when you convert the planned order into a production order?
- A. They are converted into a production order.
- B. They are converted into a reservation.
- C. They are converted into a schedule line.
- D. They are converted into a planned order.
Answer: B
NEW QUESTION 45
What could be the reason for multiple commitment of invidula capacities, where several operations have the same scheduled dates on a work center (or resource) after planing?
- A. Alternative work centers are fully occupied.
- B. The work center has several invidula capacities.
- C. The Change Planning Direction indicator is set in strategy profile.
- D. The finite Scheduling indicator is NOT set in the strategy profile.
Answer: B,D
NEW QUESTION 46
How would you define pegging in the context of Advanced Planning?
- A. An evaluation to verify if there are material or capacity shortages in the network after the production planning run.
- B. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements
- C. An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between the receipt and the issue elements
- D. An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run
Answer: C
NEW QUESTION 47
You have maintained the parameters for simple discontinuation in the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past?
- A. Material requirements planning
- B. Kanban
- C. Production order release
- D. Backflushing
Answer: A
NEW QUESTION 48
You are working with planning strategy 40 (Planning-with-final assembly) When does consuption of planned independent requirements take places?
- A. When you create a sales order
- B. When you create a planned order
- C. When you deliver a sales order
- D. When the MRP result are saved
Answer: A
NEW QUESTION 49
What do you use to dispatch operations from planned orders so that the production plan can be fulfilled?
- A. Capacity Requirements Planning (CRP)
- B. Demand Planning (DP)
- C. Material Requirements Planning (MRP)
- D. Supply Network Planning (SNP)
Answer: C
NEW QUESTION 50
What is a work center hierarchy in planning in SAP S/4HANA?
- A. A group of alternative work centers providing a cumulative available capacity for production.
- B. A group of work centers in a production line being used in sequence for production
- C. A group of work centers in a parallel sequence that is used to split production quantities and work on them in parallel
- D. A group of alternative work centers for production, structured in hierarchy levels by priorities
Answer: A
NEW QUESTION 51
Which of the following questions do you have to answer before you start creating a BOM?
- A. Which Valid To information is necessary?
- B. Is the material type allowed in the BOM?
- C. What status does the BOM have?
- D. In which storage location is the BOM required?
Answer: A,B
NEW QUESTION 52
You want to schedule an operation finitely, without moving other operations. Which scheduing strategy do you select?
- A. Insert operation
- B. Squeeze in
- C. Find slot
- D. Schedule in working time only
Answer: C
NEW QUESTION 53
What is the purpose of a reporting point confirmation in repetitive manufacturing?
- A. To stage different components for a production line simultaneously
- B. To determine the work in progress along the production line
- C. To provide timely updates of inventory management for the staged components
- D. To reduce the total production lead time for along production line
Answer: B,C
NEW QUESTION 54
......
SAP C-TS422-2021 Exam Description:
The "SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing" certification exam validates that the candidate possesses the fundamental and core knowledge required of the SAP S/4HANA Manufacturing consultant profile. This certification proves that the candidate has an overall understanding and inādepth technical skills to participate as a member of a project team in a mentored role.
Test Engine to Practice C-TS422-2021 Test Questions: https://www.certkingdompdf.com/C-TS422-2021-latest-certkingdom-dumps.html