SAP Certified Application Associate C-TS422-2021 Practice Test Engine Try These 82 Exam Questions [Q29-Q54]

Share

SAP Certified Application Associate C-TS422-2021 Practice Test Engine: Try These 82 Exam Questions

Guaranteed Success in SAP Certified Application Associate C-TS422-2021 Exam Dumps


C-TS422-2021 Exam Certification Details:

Exam:80 questions
Sample Questions: SAP C-TS422-2021 Exam Sample Question
Duration:180 mins
Level:Associate


SAP C-TS422-2021 Certification Exam Topics:

Topic AreasTopic Details, Courses, Books
Capacity Planning in SAP S/4HANA 8% - 12%

Outline best practices for using SAP S/4HANA, describe the SAP HANA database concept and new user experience with SAP Fiori, outline the capabilities of embedded analytics.

Material Requirements Planning in SAP S/4HANA 8% - 12%

Select and apply planning strategies, use the planning table, characterize long-term planning and master production scheduling, outline MRP basics and steps of MRP, and describe lot size procedures.

Master Data in SAP S/4HANA > 12%

Identify and explain production relevant master data, including, but not limited to: bill of material, routing and production version.

Lean Manufacturing in SAP S/4HANA 8% - 12%

Identify repetitive manufacturing specific master data, explain line load planning and confirmation, outline Kanban master data and Kanban processes.

Introduction to SAP S/4HANA Production Planning < 8%

Outline production planning components and functions, differentiate consumption-based planning vs. MRP, outline new trends in production planning.


 

NEW QUESTION 29
Which SAP solutions support the supplier area in the portfolio of the Digital Value Network?

  • A. SAP Concur
  • B. SAP Fieldglass
  • C. SAP SuccessFactors
  • D. SAP Ariba
  • E. SAP Hybris

Answer: A,B,D

 

NEW QUESTION 30
Which time elements are part of a routing operation?

  • A. Pick/pack time
  • B. Queue time
  • C. Float before production
  • D. Wait time
  • E. Move time

Answer: A,B,D

 

NEW QUESTION 31
Your production planners must execute planning only for specific resources. How can you achive this in advanced Planning(PP/DS)

  • A. Use heuristic.
  • B. Use a planning group.
  • C. Use a resource group.
  • D. Use a propagation range.

Answer: A

 

NEW QUESTION 32
How can you carry out cost object controlling for production orders?

  • A. Milestone-related
  • B. Order-related
  • C. Cost-related
  • D. Product-related

Answer: B,D

 

NEW QUESTION 33
How can you set up the supply source for the Kanban process in SAP S/4HANA?

  • A. Using purchase orders for external procurement
  • B. Using stock transfer reservations for stock transfer
  • C. Using quotations for internal and external procurement
  • D. Using purchasing costs for automated source prioritization
  • E. Using run schedule quantities for in-house production

Answer: A,B,E

 

NEW QUESTION 34
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?

  • A. When multiple production versions are maintained for one product
  • B. When multiple planned orders exist on one resource
  • C. When multiple operations are maintained for one product
  • D. When alternate resources are used within one operation

Answer: D

 

NEW QUESTION 35
What are the consequences when you assgn a planned order to a production line manually, using the planning table in repetitive manufacturing?

  • A. The planed order generates capacity requirements
  • B. The planed order's component availability is checked.
  • C. The planned order's components are copied to the picking list.
  • D. The planed order is converted to production order.

Answer: A

 

NEW QUESTION 36
You use planning strategy Finite Scheduling - with Reverse adn want to allow scheduling in the past. How can you achive this?

  • A. Specify a negative offset time in the strategy profile.
  • B. Specify a negative lanning horizon in the strategy profile.
  • C. Specify a positive planning horizon in the strategy profile.
  • D. Specify a positive offset time in the strategy profile.

Answer: A

 

NEW QUESTION 37
When working with bouth cross-plant and plant-specific material statuses n the material master, which statuses has the higest priority?

  • A. The last restrictive status
  • B. The plant-specific status
  • C. The most restrictive status
  • D. The cross-plant status

Answer: C

 

NEW QUESTION 38
For what production type are production orders used?

  • A. Process manufacturing processes
  • B. Discrete manufacturing processes
  • C. Period and quantity-oriented production
  • D. Replenishment controlled by control cycles

Answer: B

 

NEW QUESTION 39
During production order creation, several valid production versions are found. How does the system choose the production version?

  • A. Alphanumeric or quota arrangement
  • B. Valid period or sale order
  • C. Planned order or material number
  • D. Lot size or material cost

Answer: A

 

NEW QUESTION 40
When can the automatic material availability check occur in a production order?

  • A. At order release
  • B. At order confirmation
  • C. At order settlement
  • D. At order creation

Answer: A,D

 

NEW QUESTION 41
Which item statuses can you select inside a material BOM?

  • A. Service
  • B. Sales
  • C. Engineering
  • D. Quality management

Answer: B,C

 

NEW QUESTION 42
What are the possible results of a production planning run in Advanced Planning (PP/DS)?

  • A. Production order
  • B. Scheduling agreement schedule line
  • C. Purchase requistion
  • D. Planned order
  • E. Stock transport order

Answer: B,C,D

 

NEW QUESTION 43
You want to use capacity availability checks for production orders. Which settings have to be made for this?

  • A. An overall profile must be assigned in the checking control.
  • B. The PRT Availability Check must be set in the checking control.
  • C. The Relevant for Finite Scheduling indicator must be set
  • D. A checking rule must be assigned in the checking control

Answer: A,C

 

NEW QUESTION 44
What happens to this dependent requirement when you convert the planned order into a production order?

  • A. They are converted into a production order.
  • B. They are converted into a reservation.
  • C. They are converted into a schedule line.
  • D. They are converted into a planned order.

Answer: B

 

NEW QUESTION 45
What could be the reason for multiple commitment of invidula capacities, where several operations have the same scheduled dates on a work center (or resource) after planing?

  • A. Alternative work centers are fully occupied.
  • B. The work center has several invidula capacities.
  • C. The Change Planning Direction indicator is set in strategy profile.
  • D. The finite Scheduling indicator is NOT set in the strategy profile.

Answer: B,D

 

NEW QUESTION 46
How would you define pegging in the context of Advanced Planning?

  • A. An evaluation to verify if there are material or capacity shortages in the network after the production planning run.
  • B. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements
  • C. An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between the receipt and the issue elements
  • D. An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run

Answer: C

 

NEW QUESTION 47
You have maintained the parameters for simple discontinuation in the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past?

  • A. Material requirements planning
  • B. Kanban
  • C. Production order release
  • D. Backflushing

Answer: A

 

NEW QUESTION 48
You are working with planning strategy 40 (Planning-with-final assembly) When does consuption of planned independent requirements take places?

  • A. When you create a sales order
  • B. When you create a planned order
  • C. When you deliver a sales order
  • D. When the MRP result are saved

Answer: A

 

NEW QUESTION 49
What do you use to dispatch operations from planned orders so that the production plan can be fulfilled?

  • A. Capacity Requirements Planning (CRP)
  • B. Demand Planning (DP)
  • C. Material Requirements Planning (MRP)
  • D. Supply Network Planning (SNP)

Answer: C

 

NEW QUESTION 50
What is a work center hierarchy in planning in SAP S/4HANA?

  • A. A group of alternative work centers providing a cumulative available capacity for production.
  • B. A group of work centers in a production line being used in sequence for production
  • C. A group of work centers in a parallel sequence that is used to split production quantities and work on them in parallel
  • D. A group of alternative work centers for production, structured in hierarchy levels by priorities

Answer: A

 

NEW QUESTION 51
Which of the following questions do you have to answer before you start creating a BOM?

  • A. Which Valid To information is necessary?
  • B. Is the material type allowed in the BOM?
  • C. What status does the BOM have?
  • D. In which storage location is the BOM required?

Answer: A,B

 

NEW QUESTION 52
You want to schedule an operation finitely, without moving other operations. Which scheduing strategy do you select?

  • A. Insert operation
  • B. Squeeze in
  • C. Find slot
  • D. Schedule in working time only

Answer: C

 

NEW QUESTION 53
What is the purpose of a reporting point confirmation in repetitive manufacturing?

  • A. To stage different components for a production line simultaneously
  • B. To determine the work in progress along the production line
  • C. To provide timely updates of inventory management for the staged components
  • D. To reduce the total production lead time for along production line

Answer: B,C

 

NEW QUESTION 54
......


SAP C-TS422-2021 Exam Description:

The "SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing" certification exam validates that the candidate possesses the fundamental and core knowledge required of the SAP S/4HANA Manufacturing consultant profile. This certification proves that the candidate has an overall understanding and in‐depth technical skills to participate as a member of a project team in a mentored role.

 

Test Engine to Practice C-TS422-2021 Test Questions: https://www.certkingdompdf.com/C-TS422-2021-latest-certkingdom-dumps.html